Today I finished the tiling on the long side plus the edge at the end. Had to get another bucket of mastic for this and now have plenty left over.
When I went to Home Depot today, I found the edges I’m going to use which was cool but darn expensive! $6.95 isn’t much… until you need 14 of them! Still, all in all, there’s no less expensive way to have a bar built.
- Goodyear blimp passing overhead to report on my progress!
- Really can’t wait to edge this thing already!
- Painting underside black for aesthetics when viewing from pool.
- Grinding out the space for brackets.
- Protruding bracket – What to do with tile??? See next pic…
- Puzzle layout on floor – long wall
- Puzzle layout on floor – short wall
Watch a video of theĀ Goodyear blimp checking up on my progress!
Running total: $570
Love how the A.D.D kicks in and you start filming the blimp!…typical!